| Pictorial
review showing the construction details of our
wood-burning oven.
Click here to view some of the great things we've baked in our oven
|

10"x16" footer with forming and re-bars in
place. | 
Footer poured and first course of block being
laid. | 
Oven sub-base has been completed and is ready
for slab to be poured. |

Base slab poured, block laid, and ready for
lintel and firebrick slab forming. | 
Partial forming for lintel, vermiculite and firebrick slabs. | 
Concretes have been poured and troweled. |
 Oven firebricks set atop slab. | 
Oven interior cavity form set atop firebricks. | 
Outer forming of oven cavity completed and ready for the pouring of refractory cement. |
| 
Oven poured and forming
removed. | 
Oven cladding has been poured and troweled. | 
Entry arch and chimney have been poured. |
 Oven interior cavity form being burned-out. | 
Facade framing installed with hurricane clips. | 
Rear view of oven showing roof and side framing
installed with hurricane straps. |

Oven is fully operational. Still needs final exterior facade finish. | 
Rita holding cross section pattern of oven interior. | 
Last, but certainly not least; Our tutor and mentor, Alan Scott of Ovencrafters |